| Construction Type and Use | 4 stories, Type IIB fully sprinklered building for office and research |
| Fire Protection | Fire and life safety systems include a multiple zone fire alarm control panels, an auto dialer a 24-hour monitoring service, hard-wired smoke and heat detectors, illuminated exit lights with battery back-up, emergency battery lighting units, horn/light annunciators, fire extinguishers and a full coverage, wet sprinkler system with check valves and tamper and flow switches. |
| Floor Plate | 37,957 RSF |
| Floor-to-Floor Height | 14’ |
| Ceiling Height | 9’ to 14’ to deck |
| Floor Load | 10-15% depending on full or partial floor |
| Roof Access | Alternating tread stairs and locking roof hatch |
| Plumbing | Includes building water access on all floors and RODI water within labs on 3rd, 4th floor (ability to tie in 2nd floor custom build to RODI is negotiable). |
| Electric | Ameren, 5,000 amps to building |
| Emergency Power | Kohler Diesel Generator 2,500 amp, 480V |
| Natural Gas | Available, provided by Spire |
| Sustainable Design | Automated lights and window shades. LEED was not applied for. |
| Electric Charging Stations | 12 charging stations |
| Passenger Elevators | 2 OTIS Gearless |
| Service Elevator | 1 OTIS Freight |
| Loading Dock | Drive-in dock with access to electric lift gate, accommodating full-size semi truck. |
| Security | Card access after hours |
| Hvac | 5 Trane RTU with GPS Plasma Air System |
| Pricing | $29.00/ SF NNN |